Spokane officials plan to extend the city’s contract with Lime for two years, but with tweaks to mollify those frustrated by downtown scooter usage....
From 1890 until the buildings were demolished in 1933, four interconnected buildings wrapped around the southeast corner of Howard Street and Riverside Avenue were...
A fire extensively damaged Coeur d’Alene’s city hall, destroying the roof and the entire top floor. This three-story brick structure also served as the...